I estimate based on materials purchased that well over 6 miles of barbed wire was strung, over 150 steel T-posts driven by hand, and well over 100 4x6 and 4x4 treated posts each sunk about three feet deep with 60 pounds of concrete in each post hole.I note the first day was Dec. 15th, taken a while,
Working alone in winter weather, I'm highly satisfied with the "while it has taken".