For storm drainage purposes, not sure how many here have technical experience w/ grading (slope) of *shrub bed, (some of) *nearby lawn AND replacing a *sidewalk w/ proper slope.
(Sorry for long post. This is a complicated issue w/ several connected factors).
The shrub bed, lawn & walk all interact for drainage, starting at small, concrete porch.
Porch is in an "L-shaped" corner, formed by:
house front wall, & attached garage (gar. extends past house).
Any suggestions of technical forums or sites that may deal w/ grading yards / shrub beds, installing (replacing) a walk - focused on drainage?
Can post pics, elevation sketches - but multiple factors make it complex.
Biggest unknown is, what slope for sidewalk (where it acts as drainage) is "enough?"
*Standard engineering guidelines for grading (anything) next to slabs is,
1/4" / ft slope (2%) for FIRST 10 ft away from slab.
(problem I'm facing, after 10 ft, guidelines seem less clear).
Problems:
A 1/4" / ft slope for 1st 10 ft is doable on the walk.
It's the "acceptable" slope of last 18 ft vs. what's physically possible that may be a problem
1.The shrub bed lawn near it) are too high vs. slab ht (or 'brick ledge' ht.)
2.5" below brk ldg in some places
It's level w/ the small, concrete frt porch & sidewalk - where meets porch.
** Much of yard is higher than walk & (part) drains onto walk (length of walk). Trees prevent lowering whole yard (I'd like to).
2.Porch (fixed ht) - only 2.5" below brk ldg. Guessing not enough.
*Slab is uneven. "Hills & valleys" in surface.
*Porch or shrub bed may be 4", **OR 3" (or less) below *slab* (can't tell). Too little for 3" - 5" / hr storm.
Either way, not close to gov't / engineering guidelines for slab ht. above finished yard, walks, patios.
Slope of shrub bed / lawn isn't near recommended 1/4" / ft for 1st 10' out from a house ( unlikely could be).
Neither is my back yd, next to house, but drainage "path" across back yard & down both sides is considerably wider than the path of sidewalk by porch (even if a ~ 24" wide strip of lawn is lowered to new walk's level - length of walk).
3.The walk is MAIN drainage from this corner - (part of) main & garage roofs + a roof valley dumps here.
4.Shrub bed (or lawn by bed) can't be lowered much w/o lowering the walk, beginning at porch (replacing walk).
5.***Have only 5.5" drop in 28 ft from porch to walk's end, now.
approx. 1/5" / ft slope over 28 ft.
*If lower the upper walk - below porch level - & don't also lower the end of walk, it reduces the walk's slope.
To lower the end of walk (by 3/4" - 1.5"), have to make a 'swale' in yard, from end of walk.
Problem: Near this “new swale” is driveway on one side - a nice oak on other.
Taking 3/4" off part of root zone may be OK, but 1.5" is different.
New sod (the soil) ~ 1/2" - 5/8" thick, must remove that added amount from new swale, so final ht is right, after install sod (ask how I know).
Likely OVER 3/4" would have to be removed from -some- part of tree root zone. Don't like it.
Have to check how far a new "swale" would have to extend;- a few ft, or across 1/2 of tree's root zone?
(Sorry for long post. This is a complicated issue w/ several connected factors).
The shrub bed, lawn & walk all interact for drainage, starting at small, concrete porch.
Porch is in an "L-shaped" corner, formed by:
house front wall, & attached garage (gar. extends past house).
Any suggestions of technical forums or sites that may deal w/ grading yards / shrub beds, installing (replacing) a walk - focused on drainage?
Can post pics, elevation sketches - but multiple factors make it complex.
Biggest unknown is, what slope for sidewalk (where it acts as drainage) is "enough?"
*Standard engineering guidelines for grading (anything) next to slabs is,
1/4" / ft slope (2%) for FIRST 10 ft away from slab.
(problem I'm facing, after 10 ft, guidelines seem less clear).
Problems:
A 1/4" / ft slope for 1st 10 ft is doable on the walk.
It's the "acceptable" slope of last 18 ft vs. what's physically possible that may be a problem
1.The shrub bed lawn near it) are too high vs. slab ht (or 'brick ledge' ht.)
2.5" below brk ldg in some places
It's level w/ the small, concrete frt porch & sidewalk - where meets porch.
** Much of yard is higher than walk & (part) drains onto walk (length of walk). Trees prevent lowering whole yard (I'd like to).
2.Porch (fixed ht) - only 2.5" below brk ldg. Guessing not enough.
*Slab is uneven. "Hills & valleys" in surface.
*Porch or shrub bed may be 4", **OR 3" (or less) below *slab* (can't tell). Too little for 3" - 5" / hr storm.
Either way, not close to gov't / engineering guidelines for slab ht. above finished yard, walks, patios.
Slope of shrub bed / lawn isn't near recommended 1/4" / ft for 1st 10' out from a house ( unlikely could be).
Neither is my back yd, next to house, but drainage "path" across back yard & down both sides is considerably wider than the path of sidewalk by porch (even if a ~ 24" wide strip of lawn is lowered to new walk's level - length of walk).
3.The walk is MAIN drainage from this corner - (part of) main & garage roofs + a roof valley dumps here.
4.Shrub bed (or lawn by bed) can't be lowered much w/o lowering the walk, beginning at porch (replacing walk).
5.***Have only 5.5" drop in 28 ft from porch to walk's end, now.
approx. 1/5" / ft slope over 28 ft.
*If lower the upper walk - below porch level - & don't also lower the end of walk, it reduces the walk's slope.
To lower the end of walk (by 3/4" - 1.5"), have to make a 'swale' in yard, from end of walk.
Problem: Near this “new swale” is driveway on one side - a nice oak on other.
Taking 3/4" off part of root zone may be OK, but 1.5" is different.
New sod (the soil) ~ 1/2" - 5/8" thick, must remove that added amount from new swale, so final ht is right, after install sod (ask how I know).
Likely OVER 3/4" would have to be removed from -some- part of tree root zone. Don't like it.
Have to check how far a new "swale" would have to extend;- a few ft, or across 1/2 of tree's root zone?